Construction Specifications
ELEMENT | SPECIFICATIONS |
Substructure | Excavation depth - 4'.0": Reinforced concrete strip footings: 8" thick solid filled block work. Termite Treatment: floor slab 4" thick; suspended slab 5" thick, both typical reinforced concrete construction Hardcore fill on sand blinding on DPM ------------------------------------- |
Structure | External Walls - 8" thick hollow concrete block walls externally reinforced vertically and horizontally Internal Walls - 4" and 6" thick hollow concrete block work reinforced vertically and horizontally Reinforced concrete ring beams ------------------------------------- |
Roof | U-profile permaclad sheeting 2" x 6" treated pitch pine rafters Grooved plywood ceiling boarding ------------------------------------- |
Windows | Single hung sash windows, concrete cills, raised mortar bands around windows
------------------------------------- |
Doors | Hardwood panel externally, raised panel pine internally, average domestic standard ironmongery
------------------------------------- |
Floor, Wall & Ceiling Finishes | 1.0mm thick textured finish on rendered walls internally: 1.5mm externally: ceramic tiles 7'.0" high to showers: ceramic floor tiles: paint or pickle finishes to ceilings. (1” x 4” skirtings)
------------------------------------- |
Plumbing Installation | British Standard or similar Water Closet Vitreous china basins Single bowl single drain stainless steel kitchen sink Hot and cold water plumbing 60 gallon solar heating units Waste and soil drainage ------------------------------------- |
Electrical Installation | General installation - average domestic standard to conform to Government Electrical Inspections Department regulations
------------------------------------- |
Furniture & Fittings | Bathroom vanities - laminated counter tops, pine panel doors Kitchen cupboards - Decoran or equivalent counters: painted plywood shelving: pine panel doors 3' 0" x 2' 0" mirrors over vanities; toilet paper holders; soap dish, shower curtain rods and towel bars. ------------------------------------- |
Drainage | Manholes, grease trap, septic tank, well and filter bed.
------------------------------------- |
External works | Broom finished concrete foot paths 3'.0" wide: general re-grading of site. |